Home > Capabilities > Research and Development

Research and Development

SBSS believes in the continuous development of Innovative solutions and technology to bring value to the subsea cable installation industry. Our Subsea department houses some of the most inventive minds in the subsea world with a simple mission in mind – Burying Cables Quicker, Safer and Deeper.

In 2008, SBSS developed upgrade modifications to the Dragon Sledge. Specially designed high precision roller bearings were incorporated within the shear to provide improved cable deployment and burial

In 2009, SBSS work jointly with SMD of UK to incorporate the world’s first hybrid injector and passive shear system into the MD3 Hi-Plough. This “Double Action” burial system enables a more consistent performance to the 3m shear, enable the most effective application of the proven MD3 plough system.

To achieve the ultimate performace in post lay burial performance, SBSS is expanding the ROV fleet and advancing forwards to attain a more powerful ROV to achieve the deepest trenching performance for Post Lay. More details will be available shortly.

seo wangzhangyouhua shanghai seo